Charterhouse School Memorial Chapel

Case Study

Client: Charterhouse School
Architect: Purcell
Quantity Surveyor: NT Surveying
Structural Engineer: Cambridge Architectural Research
Specialist Contractor: Stonewest

As Principal Contractor, Stonewest was appointed by Charterhouse School to restore its iconic Chapel.  Designed by Sir Giles Gilbert Scott, the Grade II* listed Chapel stands as the UK’s largest war memorial.

In collaboration with Purcell, our scope included delicate cleaning and masonry repairs to the Bargate stone plus a major scheme of lime mortar repointing work.

External scaffolding was assembled with protections for the fabric, alongside internal scaffolding for maintenance of the Chapel Organ.

Additionally, we addressed repairs to leadwork, tiles, windows, and the flat roofs and gutters.

We took pride in preserving this historic chapel for future generations of students, educators, and visitors.

 

Learn more about our Services:

Principal Contracting

Facade Cleaning & Restoration

Conservation

Related Projects

London Bridge Station

THE PENINSULA HOTEL, YANGON, MYANMAR (CONSERVATION PACKAGE)

THE VICTORIA & ALBERT MUSEUM (Heritage)

Regents Crescent (Ice House)

Queen Victoria Memorial

Brookwood 1914-1918 Memorial – new design

KOM TONG HALL (DR SUN YAT-SEN MUSEUM)

“JESSVILLE”128 POK FU LAM ROAD, HONG KONG

The Royal Pavilion, Brighton

FORMER CENTRAL GOVERNMENT OFFICE WEST WING, HONG KONG

UNIVERSITY OF CHICAGO CENTRE, HONG KONG (Conservation Package)

Buckingham Palace, Queen’s Gallery & Kitchen

THE PENINSULA HOTEL, YANGON, MYANMAR (FACADE STRENGTHENING PACKAGE)

Palace of Westminster, Maintenance

TAI KWUN, CENTRAL POLICE STATION, HONG KONG (Facade Restoration Package)

QASR AL HOSN, ABU DHABI, UAE

ST PAUL’S CATHEDRAL (Equal Access Ramps)

Cradle Tower, Tower of London

Royal College of Surgeons, Lincoln’s Inn

LONDON BRIDGE CITY MAINTENANCE

Kimpton Fitzroy, Russell Hotel

TAI HANG FIRE DRAGON CENTRE, HONG KONG

Cowdray & Midhurst Heritage

Interested in working with us?

Tell us more about your project requirements
image1
image2